• About
  • Advertise
  • Privacy Policy
  • Contact
Wednesday, October 22, 2025
  • Login
The Vaultz News
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2DNew
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships
No Result
View All Result
The Vaultz News
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2DNew
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships
No Result
View All Result
The Vaultz News
No Result
View All Result

Risks Affecting Financial Costs for Renewable Energy Systems, Biggest Worry to Investors- Report

M.Cby M.C
December 2, 2021
Reading Time: 4 mins read
M.Cby M.C
in Extractives/Energy, Sub Top Stories2
0
steel

Hydrogen renewable energy production - hydrogen gas for clean electricity solar and windturbine facility. 3d rendering.

Risks affecting financial costs for renewable energy systems (RES) remain the biggest worry to investors (73% of survey respondents), with inflation and currency risks considered as provoking concerns to financing, according to a PwC report.

Over the past decade, Ghana has struggled with large fiscal and external imbalances due to unsustainable government spending, resulting in double-digit inflation and large depreciation of the cedi.

Two years ago, Ghana exited an extended credit facility arrangement with the IMF, which helped in achieving macroeconomic stability, only to be disrupted in the subsequent year due to the impact of the covid-19 pandemic. This has resulted in a sharp increase in public debt and a record fiscal deficit, sparking renewed concerns among private investors, the report warned.

RelatedPosts

Ghana’s Banking Sector Loses Nearly GH¢100m to Fraud — BoG Report Reveals

Atlantic Lithium Uncovers Major Lithium Anomalies in Côte d’Ivoire 

Ghana’s Climate Minister Issifu Appointed to CVF-V20 Board in Washington 

In this vein, the report extended financing cost concerns to include the risks to available and ready financing by the private and public sectors. A little over half (55%) of the respondents surveyed indicated that access to financing was one of the problems obfuscating landmark renewable energy projects in the country.

In line with Ghana’s ambition to become a financial services hub, domestic resource mobilization efforts towards this end are laudable, “but more effort is needed to develop and bolster local capital markets”, the report stressed.

 “Weak credit worthiness of the offtaker and Ghana’s status as high-risk for debt distress may take Development Finance Institutions (DFIs) and other international financial institutions wary of offering financing for projects in the country.”

PwC Report

By de-risking access to finance together with financial costs, the report recommended “the pursuance of prudent macroeconomic policies to reduce the risk of debt distress and restore stability.”

ADVERTISEMENT
Opacity in PPA Agreements, a Worry to Investors

Survey respondents highlighted risks affecting revenues of renewable energy systems assets as the second most important area of concern for private investors. The two offtakers in Power Purchase Agreements contracts with Independent Power Producers (IPPs) within the energy sector are the Volta River Authority and the Electricity Company of Ghana.

However, the opacity of most of these agreements have led to the termination of contracts, others involving take-or-pay agreements. These issues have contributed to the piling of debts within the energy sector.

A case in point is the recent termination and renegotiations of PPAs which had been signed during Ghana’s electricity supply crisis in early 2010s. These actions were among a broad scheme by the government to mitigate the overcapacity and financial issues resulting from uncoordinated and non-transparent public procurement.

Due to these circumstances, 50% of private sector respondents indicated that concerns about transparency and fairness were among the risks within the renewable energy space.

Another issue that poses an even greater risk to private investors is the local content requirements within the renewable energy space, the report indicated. The 2017 Legislative Instrument (L.I. 2354) which stipulates local content and participation in the electricity supply industry defines strict minimum levels of Ghanaian ownership and participation in renewable energy projects.

Despite the already considerable initial participation levels, L.I. 2354 mandates further increases over time, with requirements reaching a minimum of 51% local ownership, 80%-100% local employment in different job categories, and 80%-100% locally manufactured or assembled renewable technologies within 5-10 years.

According to the report, over half of private sector survey respondents, considered the local content requirements as demanding and a significant barrier to investment, especially in the absence of local manufacturing capacity for certain components.

The report recommends that the government should review the local content requirements currently in place, including through a broad business to government dialogue. This is so that a balance can be struck between a drive to stimulate the local economy and the need to better reflect local capacity constraints and bottlenecks.

“As an alternative to overly stringent local content requirements, strive to build local technical skills through knowledge transfer programs, technical assistance and capacity building.”

PwC Report

Ghana’s Renewable Energy Master Plan projects that by 2030, renewable energies would form 10% of the country’s energy mix. To make sustained progress in this regard, these major issues including risks to finance, transparency and fairness in PPA agreements, among others should be addressed to facilitate investments in renewable energy systems.

READ ALSO: Drop E-levy, it’s Distortionary, Discriminative and Inefficient- Economists Warn

Tags: Electricity Company of GhanafinancePower purchase agreementsRenewable energiesVolta River Authority
Please login to join discussion
Previous Post

Fulfill your initial agricultural policies in the 2021 Budget- Chamber of Agribusiness

Next Post

I Didn’t pull the Trigger- Alec Baldwin

Subscription Form

Related Posts

Ghana’s Banking Sector Loses Nearly GH¢100m to Fraud — BoG Report Reveals
Banking

Ghana’s Banking Sector Loses Nearly GH¢100m to Fraud — BoG Report Reveals

October 21, 2025
Global Lithium Market
Extractives/Energy

Atlantic Lithium Uncovers Major Lithium Anomalies in Côte d’Ivoire 

October 21, 2025
Hon. Seidu Issifu, Minister of State for Climate Change and Sustainability
Extractives/Energy

Ghana’s Climate Minister Issifu Appointed to CVF-V20 Board in Washington 

October 21, 2025
Energy Minister Touts Sector Strides
Extractives/Energy

Energy Minister Touts Sector Strides

October 21, 2025
Ghana Extends Jubilee, TEN Oil Licences to 2040, Unlocking $2 Billion Investment
Extractives/Energy

Ghana Paying for Past Policy Indecisions as Oil Revenues Decline — Prof. Lord Mensah 

October 21, 2025
GoldBod Arrests Two Suspects over Gold Smuggling
Extractives/Energy

GoldBod Arrests Two Suspects over Gold Smuggling

October 20, 2025
Big Push: Mahama Cuts Sod for Several Road Construction in Volta Region
General News

Big Push: Mahama Cuts Sod for 73.6km Cape Coast–Takoradi Dual Carriageway, Pledges Rapid Completion 

by evansjrOctober 21, 2025
A member of a forensic team inspects a window believed to have been used in a robbery at the Louvre Museum in Paris, France, on October 19, 2025.
Europe

Louvre Heist Losses Estimated Around €88m

by Comfort AmpomaaOctober 21, 2025
Old Mutual Ghana Champions Stakeholder Care with GH¢130K Group Welfare Payout
Insurance

Old Mutual Ghana Champions Stakeholder Care with GH¢130K Group Welfare Payout

by M.COctober 21, 2025
Haruna Iddrisu Champions Collaboration, Advocates UDS Bill at Conference
General News

Minority Leader Condemns Dismissals and Erosion of Rule of Law As Parliament Resumes 

by Silas Kafui AssemOctober 21, 2025
Speaker Bagbin Swears in Two Members of Parliament
General News

Speaker Bagbin Swears in Two Members of Parliament

by Emmanuel Tibila BoasahOctober 21, 2025
24-Hour Economy Cost Underestimated, Sarkodie Bemoans
Economy

24-Hour Economy Cost Underestimated, Sarkodie Bemoans

by Michael Teye-Bio NaduteyOctober 21, 2025
Big Push: Mahama Cuts Sod for Several Road Construction in Volta Region
A member of a forensic team inspects a window believed to have been used in a robbery at the Louvre Museum in Paris, France, on October 19, 2025.
Old Mutual Ghana Champions Stakeholder Care with GH¢130K Group Welfare Payout
Haruna Iddrisu Champions Collaboration, Advocates UDS Bill at Conference
Speaker Bagbin Swears in Two Members of Parliament
24-Hour Economy Cost Underestimated, Sarkodie Bemoans

Recent News

Big Push: Mahama Cuts Sod for Several Road Construction in Volta Region

Big Push: Mahama Cuts Sod for 73.6km Cape Coast–Takoradi Dual Carriageway, Pledges Rapid Completion 

October 21, 2025
A member of a forensic team inspects a window believed to have been used in a robbery at the Louvre Museum in Paris, France, on October 19, 2025.

Louvre Heist Losses Estimated Around €88m

October 21, 2025
Old Mutual Ghana Champions Stakeholder Care with GH¢130K Group Welfare Payout

Old Mutual Ghana Champions Stakeholder Care with GH¢130K Group Welfare Payout

October 21, 2025
Haruna Iddrisu Champions Collaboration, Advocates UDS Bill at Conference

Minority Leader Condemns Dismissals and Erosion of Rule of Law As Parliament Resumes 

October 21, 2025
Speaker Bagbin Swears in Two Members of Parliament

Speaker Bagbin Swears in Two Members of Parliament

October 21, 2025
24-Hour Economy Cost Underestimated, Sarkodie Bemoans

24-Hour Economy Cost Underestimated, Sarkodie Bemoans

October 21, 2025
The Vaultz News

Copyright © 2025 The Vaultz News. All rights reserved.

Navigate Site

  • About
  • Advertise
  • Privacy Policy
  • Contact

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2D
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships

Copyright © 2025 The Vaultz News. All rights reserved.

Discover the Details behind the story

Get an in-depth analysis of the news from our top editors

Enter your email address