• About
  • Advertise
  • Privacy Policy
  • Contact
Thursday, October 23, 2025
  • Login
The Vaultz News
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2DNew
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships
No Result
View All Result
The Vaultz News
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2DNew
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships
No Result
View All Result
The Vaultz News
No Result
View All Result

US$480 Million Solar Energy Facility To Increase Power Supply Under Construction-BPA

M.Cby M.C
September 24, 2020
Reading Time: 3 mins read
M.Cby M.C
in Extractives/Energy
0
US$480 Million Solar Energy Facility To Increase Power Supply Under Construction-BPA

The Bui Power Authority (BPA),  is constructing a US$480 million-dollar solar energy facility to increase its power supply system in the country. 

Mr Peter Acheampong, the Renewable Energy Manager of BPA, managers of the Bui Hydropower Dam project in the Banda District of the Bono Region, disclosed that, the solar farm upon completion,  would add 250 Megawatts (MW) of power to the existing 400 MW dam’s production capacity.

He said that, the first phase of the solar development which is a 10 MW power is set to be completed by October, this year, with the second phase, a 40 MW to be completed at the end of 2020.

According to him, expansion works has already been completed on the Dam’s switchyard to accommodate the additional energy that would be generated from the 297-hectare solar farm, expected to last 25 years, before the recycling and changing of panels and work on the installation of the solar panels at the farm was steadily progressing.


He indicated as part of the BPA’s achievements within the renewable energy sector, a 1MW floating plant was also under construction on the Bui Reservoir, a project which would be the first of its kind in the West Africa sub-region.

solar panels 696x522 1


Mr Acheampong explained the development of the solar project was part of the government’s National Determined Contribution (NDC) towards the United Nation’s Framework Convention on Climate Change (UNFCC).

RelatedPosts

Forestry Commission Shares Ghana’s Illegal Mining Plights with Zambian Delegation

GAEC Intensifies Efforts in Extractive Industries’ Sustainability

Dangote to Expand Refinery to 1.4 Million Barrels Per Day 

He noted that, the BPA strives to adopt innovative and sustainable technologies within the renewable energy sphere to meet its commitment to the agreement.

The government through the Ministry of Energy has outlined programmes and policies that would assist in the achievement of the set target of the Sustainable Development Goals (SDGs) 13-Climate action.

He added that, “To achieve the set targets, the BPA, leaders in the renewable energy was given the mandate to develop renewable energy potentials within the Bui Enclave and the Western Rivers.”

Mr Acheampong said, the Authority had since positioned itself to spearhead the development of renewable energy, particularly solar PV and hydro within the country to promote the government’s policy of increasing the renewable energy mix by 2030.

With the addition of the solar power, he said the BPA would still be capable of its normal operations while at the same time collaborating with the solar plant during the daytime off-peak period by providing the needed intermittency mitigation, power modulation and voltage regulation.



“To further complement our efforts in renewable energy, the Authority’s properties, particularly the head office in Accra operates as a ‘green building’ by running a hybrid of 30KW solar PV and 5KW wind systems, thereby reducing the total energy consumption of the building.”



The Bui hydro-electric project was designed primarily for hydro-power generation. It, however, includes the development of an irrigation scheme for agriculture development and presents an opportunity for enhanced eco-system and fisheries and also comprises a resettlement and community support programme.

ADVERTISEMENT
Tags: BuiEnergyrenewable energysolar
Please login to join discussion
Previous Post

President Akufo-Addo reiterates government’s pledge to ensure safe and credible elections

Next Post

Inability Of Road Safety Laws To Be Passed Due To Lockdown – Kwame Atuahene Suggests

Subscription Form

Related Posts

Forestry Commission Shares Ghana’s Illegal Mining Plights with Zambian Delegation
Extractives/Energy

Forestry Commission Shares Ghana’s Illegal Mining Plights with Zambian Delegation

October 22, 2025
GAEC Intensifies Efforts in Extractive Industries’ Sustainability
Extractives/Energy

GAEC Intensifies Efforts in Extractive Industries’ Sustainability

October 22, 2025
Dangote to Expand Refinery to 1.4 Million Barrels Per Day 
Extractives/Energy

Dangote to Expand Refinery to 1.4 Million Barrels Per Day 

October 22, 2025
Effective Governance Critical for Mineral Sector Transformation – Rev. Paul Boafo
Extractives/Energy

Effective Governance Critical for Mineral Sector Transformation – Rev. Paul Boafo

October 22, 2025
Ghana Gold Board (GoldBod)
Extractives/Energy

GoldBod Opens Licensing for Jewellery, Fabrication, and Refinery Businesses 

October 22, 2025
Parliament of Ghana
Extractives/Energy

Parliament to Hold Special Hearings on Extractive Industries to Drive Job Creation 

October 22, 2025
Minority Accuses Government of Running Away from Anti-LGBTQ+ Bill
General News

Minority Accuses Government of Running Away from Anti-LGBTQ+ Bill

by Silas Kafui AssemOctober 22, 2025
Louvre Director, Laurence des Cars.
Europe

Louvre Director Admits Security Failure

by Comfort AmpomaaOctober 22, 2025
Forestry Commission Shares Ghana’s Illegal Mining Plights with Zambian Delegation
Extractives/Energy

Forestry Commission Shares Ghana’s Illegal Mining Plights with Zambian Delegation

by Bless Banir YarayeOctober 22, 2025
Professionals question IMF’s Impact on Ghana’s Economy
Economy

Professionals question IMF’s Impact on Ghana’s Economy

by Michael Teye-Bio NaduteyOctober 22, 2025
Deputy Governor Hails Ghana’s GH¢3 Trillion Digital Payment Boom
Banking

Deputy Governor Hails Ghana’s GH¢3 Trillion Digital Payment Boom

by M.COctober 22, 2025
Israel’s Expansion Of Settlements In Occupied West Bank Slammed
Asia

Knesset Advances Bill To Impose Israeli Sovereignty On Occupied West Bank

by Comfort AmpomaaOctober 22, 2025
Minority Accuses Government of Running Away from Anti-LGBTQ+ Bill
Louvre Director, Laurence des Cars.
Forestry Commission Shares Ghana’s Illegal Mining Plights with Zambian Delegation
Professionals question IMF’s Impact on Ghana’s Economy
Deputy Governor Hails Ghana’s GH¢3 Trillion Digital Payment Boom
Israel’s Expansion Of Settlements In Occupied West Bank Slammed

Recent News

Minority Accuses Government of Running Away from Anti-LGBTQ+ Bill

Minority Accuses Government of Running Away from Anti-LGBTQ+ Bill

October 22, 2025
Louvre Director, Laurence des Cars.

Louvre Director Admits Security Failure

October 22, 2025
Forestry Commission Shares Ghana’s Illegal Mining Plights with Zambian Delegation

Forestry Commission Shares Ghana’s Illegal Mining Plights with Zambian Delegation

October 22, 2025
Professionals question IMF’s Impact on Ghana’s Economy

Professionals question IMF’s Impact on Ghana’s Economy

October 22, 2025
Deputy Governor Hails Ghana’s GH¢3 Trillion Digital Payment Boom

Deputy Governor Hails Ghana’s GH¢3 Trillion Digital Payment Boom

October 22, 2025
Israel’s Expansion Of Settlements In Occupied West Bank Slammed

Knesset Advances Bill To Impose Israeli Sovereignty On Occupied West Bank

October 22, 2025
The Vaultz News

Copyright © 2025 The Vaultz News. All rights reserved.

Navigate Site

  • About
  • Advertise
  • Privacy Policy
  • Contact

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2D
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships

Copyright © 2025 The Vaultz News. All rights reserved.

Discover the Details behind the story

Get an in-depth analysis of the news from our top editors

Enter your email address