• About
  • Advertise
  • Privacy Policy
  • Contact
Sunday, July 19, 2026
  • Login
The Vaultz News
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2DNew
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships
No Result
View All Result
The Vaultz News
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2DNew
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships
No Result
View All Result
The Vaultz News
No Result
View All Result
in Extractives/Energy

US$480 Million Solar Energy Facility To Increase Power Supply Under Construction-BPA

Maynard Championby Maynard Champion
September 24, 2020
Reading Time: 3 mins read
Add as Preferred on Google
solarrrrrrrrrrrrr

The Bui Power Authority (BPA),  is constructing a US$480 million-dollar solar energy facility to increase its power supply system in the country. 

Mr Peter Acheampong, the Renewable Energy Manager of BPA, managers of the Bui Hydropower Dam project in the Banda District of the Bono Region, disclosed that, the solar farm upon completion,  would add 250 Megawatts (MW) of power to the existing 400 MW dam’s production capacity.

He said that, the first phase of the solar development which is a 10 MW power is set to be completed by October, this year, with the second phase, a 40 MW to be completed at the end of 2020.

According to him, expansion works has already been completed on the Dam’s switchyard to accommodate the additional energy that would be generated from the 297-hectare solar farm, expected to last 25 years, before the recycling and changing of panels and work on the installation of the solar panels at the farm was steadily progressing.


He indicated as part of the BPA’s achievements within the renewable energy sector, a 1MW floating plant was also under construction on the Bui Reservoir, a project which would be the first of its kind in the West Africa sub-region.

solar panels 696x522 1


Mr Acheampong explained the development of the solar project was part of the government’s National Determined Contribution (NDC) towards the United Nation’s Framework Convention on Climate Change (UNFCC).

He noted that, the BPA strives to adopt innovative and sustainable technologies within the renewable energy sphere to meet its commitment to the agreement.

The government through the Ministry of Energy has outlined programmes and policies that would assist in the achievement of the set target of the Sustainable Development Goals (SDGs) 13-Climate action.

He added that, “To achieve the set targets, the BPA, leaders in the renewable energy was given the mandate to develop renewable energy potentials within the Bui Enclave and the Western Rivers.”

Mr Acheampong said, the Authority had since positioned itself to spearhead the development of renewable energy, particularly solar PV and hydro within the country to promote the government’s policy of increasing the renewable energy mix by 2030.

With the addition of the solar power, he said the BPA would still be capable of its normal operations while at the same time collaborating with the solar plant during the daytime off-peak period by providing the needed intermittency mitigation, power modulation and voltage regulation.

ADVERTISEMENT



“To further complement our efforts in renewable energy, the Authority’s properties, particularly the head office in Accra operates as a ‘green building’ by running a hybrid of 30KW solar PV and 5KW wind systems, thereby reducing the total energy consumption of the building.”



The Bui hydro-electric project was designed primarily for hydro-power generation. It, however, includes the development of an irrigation scheme for agriculture development and presents an opportunity for enhanced eco-system and fisheries and also comprises a resettlement and community support programme.

ADVERTISEMENT

Sign Up to Our Newsletter

Fresh updates, Straight to your inbox

Tags: BuiEnergyrenewable energysolar
ShareTweetShareSendSend
Please login to join discussion
Previous Post

President Akufo-Addo reiterates government’s pledge to ensure safe and credible elections

Next Post

Inability Of Road Safety Laws To Be Passed Due To Lockdown – Kwame Atuahene Suggests

Related Posts

WhatsApp Image 2026 07 18 at 13.08.19 1
Extractives/Energy

Energy Commission Tightens Clean Cooking Appliance Rules

July 18, 2026
MIIF with GhIB
Extractives/Energy

MIIF Partners GhIB to Attract Investments in Critical Minerals Sector

July 18, 2026
Lithium products
Extractives/Energy

France Directs Sovereign Mineral Strategies Targeting Domestic Lithium Extraction Projects

July 17, 2026
WhatsApp Image 2026 07 17 at 14.10.36 5
Extractives/Energy

Global Firms Explore Ghana’s Renewable Energy Market

July 17, 2026
ADVERTISEMENT

Sign Up to Our Newsletter

Fresh updates, Straight to your inbox

ADVERTISEMENT

Recent News

17844186020851007634969126248034

Saka Nets Hattrick, Mbappé and Olise Make History as England Win Bronze

July 18, 2026
Dr Justice Srem Sai, Deputy Attorney General and Minister for Justice

Dep. AG: No Plea Deal Reached in Wontumi’s GHC30m Eximbank Trial

July 18, 2026
Morgan Rogers is set to leave Aston Villa for Chelsea

Chelsea Set for Record Morgan Rogers Move After £117m Agreement With Aston Villa

July 18, 2026
Teacher Trainee Association of Ghana

TTAG Confirms Disbursement of Teacher Trainee Allowances

July 18, 2026
Dr Justice Srem Sai, Deputy Attorney General and Minister for Justice

Justice Will Be Served in Adu-Boahene’s GHC49.1 Million Trial, Dep. AG

July 18, 2026
ADVERTISEMENT
Next Post
Kwame Atuahene, Head of Regulations and Compliance, NRSA.

Inability Of Road Safety Laws To Be Passed Due To Lockdown – Kwame Atuahene Suggests

The Vaultz News

Copyright © 2025 The Vaultz News. All rights reserved.

Navigate Site

  • About
  • Advertise
  • Privacy Policy
  • Contact

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2D
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships

Copyright © 2025 The Vaultz News. All rights reserved.

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.