• About
  • Advertise
  • Privacy Policy
  • Contact
Sunday, June 7, 2026
  • Login
The Vaultz News
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2DNew
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships
No Result
View All Result
The Vaultz News
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2DNew
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships
No Result
View All Result
The Vaultz News
No Result
View All Result
in Extractives/Energy

US$480 Million Solar Energy Facility To Increase Power Supply Under Construction-BPA

Maynard Championby Maynard Champion
September 24, 2020
Reading Time: 3 mins read
solarrrrrrrrrrrrr

The Bui Power Authority (BPA),  is constructing a US$480 million-dollar solar energy facility to increase its power supply system in the country. 

Mr Peter Acheampong, the Renewable Energy Manager of BPA, managers of the Bui Hydropower Dam project in the Banda District of the Bono Region, disclosed that, the solar farm upon completion,  would add 250 Megawatts (MW) of power to the existing 400 MW dam’s production capacity.

He said that, the first phase of the solar development which is a 10 MW power is set to be completed by October, this year, with the second phase, a 40 MW to be completed at the end of 2020.

According to him, expansion works has already been completed on the Dam’s switchyard to accommodate the additional energy that would be generated from the 297-hectare solar farm, expected to last 25 years, before the recycling and changing of panels and work on the installation of the solar panels at the farm was steadily progressing.


He indicated as part of the BPA’s achievements within the renewable energy sector, a 1MW floating plant was also under construction on the Bui Reservoir, a project which would be the first of its kind in the West Africa sub-region.

solar panels 696x522 1


Mr Acheampong explained the development of the solar project was part of the government’s National Determined Contribution (NDC) towards the United Nation’s Framework Convention on Climate Change (UNFCC).

He noted that, the BPA strives to adopt innovative and sustainable technologies within the renewable energy sphere to meet its commitment to the agreement.

The government through the Ministry of Energy has outlined programmes and policies that would assist in the achievement of the set target of the Sustainable Development Goals (SDGs) 13-Climate action.

He added that, “To achieve the set targets, the BPA, leaders in the renewable energy was given the mandate to develop renewable energy potentials within the Bui Enclave and the Western Rivers.”

Mr Acheampong said, the Authority had since positioned itself to spearhead the development of renewable energy, particularly solar PV and hydro within the country to promote the government’s policy of increasing the renewable energy mix by 2030.

With the addition of the solar power, he said the BPA would still be capable of its normal operations while at the same time collaborating with the solar plant during the daytime off-peak period by providing the needed intermittency mitigation, power modulation and voltage regulation.

ADVERTISEMENT



“To further complement our efforts in renewable energy, the Authority’s properties, particularly the head office in Accra operates as a ‘green building’ by running a hybrid of 30KW solar PV and 5KW wind systems, thereby reducing the total energy consumption of the building.”



The Bui hydro-electric project was designed primarily for hydro-power generation. It, however, includes the development of an irrigation scheme for agriculture development and presents an opportunity for enhanced eco-system and fisheries and also comprises a resettlement and community support programme.

Sign Up to Our Newsletter

Fresh updates, Straight to your inbox

Tags: BuiEnergyrenewable energysolar
Share1Tweet1ShareSendSend
Please login to join discussion
Previous Post

President Akufo-Addo reiterates government’s pledge to ensure safe and credible elections

Next Post

Inability Of Road Safety Laws To Be Passed Due To Lockdown – Kwame Atuahene Suggests

Related Posts

Ghana National Gas Limited Company  with the manufacturing firms
Extractives/Energy

Ghana Gas Dismisses False Claims of Division, Touts Operational Records

June 7, 2026
Board of Directors of Tema Oil Refinery (TOR)
Extractives/Energy

TOR Board Inspects Ongoing Projects as Refinery Targets Expansion & Operational Efficiency

June 6, 2026
AKSA Staff with Hon. John Abdulai Jinapor, the Minister for Energy and Green Transition
Extractives/Energy

AKSA Project to Add 900MW Generation Capacity to Power System – Energy Minister

June 6, 2026
Charles Obeng Kwarteng, Finance Manager of the Zijin Golden Ridge Limited
Extractives/Energy

We Will Have Ourselves to Blame If Mining Fails – Charles Kwarteng Warns

June 5, 2026

Sign Up to Our Newsletter

Fresh updates, Straight to your inbox

Recent News

Ghana National Gas Limited Company  with the manufacturing firms

Ghana Gas Dismisses False Claims of Division, Touts Operational Records

June 7, 2026
The Minister of Foreign Affairs, Honourable Okudzeto Ablakwa

Foreign Affairs Minister Announces Jobs for Ghanaian Returnees from South Africa

June 7, 2026
345 Ghanaians Return

345 More Ghanaians Return Home As South Africa Evacuation Continues

June 7, 2026
National Communications Director of the United Party, Solomon Owusu

NPP Could Poll Just 18% in 2028 if It Drops NAPO – Solomon Owusu Warns

June 6, 2026
Osagyefo Oliver Barker-Vormawor, Legal Practitioner and Activist

Refer Anti-LGBTQ+ Bill to Council of State for 2/3 Majority Approval – Barker-Vormawor

June 6, 2026
Next Post
Kwame Atuahene, Head of Regulations and Compliance, NRSA.

Inability Of Road Safety Laws To Be Passed Due To Lockdown – Kwame Atuahene Suggests

The Vaultz News

Copyright © 2025 The Vaultz News. All rights reserved.

Navigate Site

  • About
  • Advertise
  • Privacy Policy
  • Contact

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2D
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships

Copyright © 2025 The Vaultz News. All rights reserved.

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.

Discover the Details behind the story

Get an in-depth analysis of the news from our top editors

Enter your email address