• About
  • Advertise
  • Privacy Policy
  • Contact
Friday, August 14, 2026
  • Login
The Vaultz News
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2DNew
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships
No Result
View All Result
The Vaultz News
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2DNew
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships
No Result
View All Result
The Vaultz News
No Result
View All Result
in Extractives/Energy

Galiano Gold Reports Metallurgical and Operational Update at Asanko Gold Mine

Maynard Championby Maynard Champion
July 9, 2022
Reading Time: 3 mins read
Add as Preferred on Google
gold

Gold bars stacked together

Galiano gold, the operator and manager of the joint venture (JV) with Gold Fields has released an update on its recent metallurgical test work and plant recoveries at the Asanko Gold Mine.

The program was aimed at further defining metallurgical recoveries at Esaase, and to add to the extensive metallurgical test work previously carried out on the Esaase deposit.

On February 25, 2022, the Company reported that the Asanko Gold Mine (AGM) experienced lower than expected recoveries in Q1 2022. This required further drilling tests to manage the situation.

Pursuant to this mandate, the company introduced an extensive drilling campaign was completed to provide representative samples for metallurgical testing.

ADVERTISEMENT

According to the company, in Q2 2022, sixteen diamond drill holes were completed, along strike through both the Esaase Main and South pits. The resulting 2,221 meter increments were tested individually at the AGM laboratory as a preliminary recovery assessment.

Per the company’s Q1 2022 report, it noted that it was moving ahead with the technical work already outlined “and will provide periodic updates as we progress through these work programs”.  The company noted it anticipates providing an update to the Asanko mine’s mineral reserves post the completion of this work, in Q1 2023.

gold
gold

Results of Metallurgical Test Proves Encouraging

As a result of the above, “encouraging results” have been received from the initial site assessment which determined the cyanide soluble gold content of pulverized intervals via Bulk Leach. This is followed by Extractable Gold technique and then fire assay of solid residue. Results to date indicate alignment with the historical metallurgical testwork previously carried out on the Esaase deposit, the company noted.

The metallurgical testing performed at the Asanko gold mine was conducted on half core material, while the corresponding retained halves have been dispatched to Bureau Veritas in Vancouver for independent third party testing. Results of the independent laboratory testing are expected late in Q3 2022.

During Q2, significant work took place to optimize the AGM’s plant performance. This included revising the mill feed blend regime, increasing the mass pull in the gravity circuit and adjusting operating parameters and reagent additions in the carbon-in-leach circuit.

ADVERTISEMENT

The optimizations resulted in recoveries increasing quarter on quarter, averaging 84 per cent in Q2 2022. Consequently, gold production was positively impacted with preliminary production of approximately 50,000 ounces during the quarter.

Matt Badylak President and Chief Executive Officer, said:

“Although work continues to further define metallurgical recoveries at Esaase, we are pleased with the initial laboratory recovery results. We are additionally encouraged by the strong performance in the plant during the quarter which resulted in preliminary production of 92,300 ounces for the first half of 2022. On the back of improving recoveries and robust production in H1, we expect to provide an update to full year guidance in our upcoming Q2 disclosures.”

Matt Badylak

The Asanko gold mine which is owned on a 50:50 joint venture with Gold Fields reported low recovery of gold throughput. The Company expects to release its full Q2 financial and operational results after the market closes on August 11, 2022.

ADVERTISEMENT

READ ALSO: Ghana Stock Exchange Partners With Nigerian Exchange to Strengthen Ties on Cross-Border

ADVERTISEMENT

Sign Up to Our Newsletter

Fresh updates, Straight to your inbox

Tags: Asankogoldmetallurgicaloperatortests
Please login to join discussion
Previous Post

Ghana Stock Exchange Partners with Nigerian Exchange to Strengthen Ties on Cross-border Initiatives

Next Post

UniCredit: Ruling Means Shareholding Has Been Restored- Lawyer

Related Posts

Fuel Prices
Extractives/Energy

Petrol and LPG Price Floors Drop as Diesel Rises

August 14, 2026
Hon. Emmanuel Armah-Kofi Buah, Minister for Lands and Natural Resources and Acting Minister for Environment, Science and Technology
Extractives/Energy

Mining Companies Obliged to Community Development Under Newly Proposed Framework

August 14, 2026
Hon. Emmanuel Armah-Kofi Buah, Minister of Lands and Natural Resources
Extractives/Energy

Gov’t to ‘Slash Down’ Large-Scale Mining Lease to 20yrs

August 14, 2026
Solar Plants
Extractives/Energy

Ghana Eyes Major Renewable-Energy Hub in Savannah Region

August 14, 2026
ADVERTISEMENT

Sign Up to Our Newsletter

Fresh updates, Straight to your inbox

ADVERTISEMENT

Recent News

GIPA officials and members of the Parliamentary Select Committee on Trade, Industry and Tourism pose for a group photograph after the working visit.

Parliament Trade Committee Backs GIPA’s Expanded Investment Mandate

August 14, 2026
BoG, CIB Ghana Move to Strengthen Banking Sector

BoG, CIB Ghana Move to Strengthen Banking Sector

August 14, 2026
download 2026 08 07T173732.275

Trump Seeks Supreme Court Approval to Restart Ballroom Work

August 14, 2026
President John Dramani Mahama

Mahama Links School Indiscipline to Phones, Backs Under-16 Internet Restriction

August 14, 2026
Mahama Unveils $10bn New Economic Era After Stabilisation Gains

Mahama Unveils $10bn New Economic Era After Stabilisation Gains

August 14, 2026
ADVERTISEMENT
Next Post
Supreme Court Affirms Bank of Ghana's Revocation of UniCredit Licence

UniCredit: Ruling Means Shareholding Has Been Restored- Lawyer

The Vaultz News

Copyright © 2025 The Vaultz News. All rights reserved.

Navigate Site

  • About
  • Advertise
  • Privacy Policy
  • Contact

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2D
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships

Copyright © 2025 The Vaultz News. All rights reserved.

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.