• About
  • Advertise
  • Privacy Policy
  • Contact
Sunday, May 31, 2026
  • Login
The Vaultz News
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2DNew
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships
No Result
View All Result
The Vaultz News
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2DNew
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships
No Result
View All Result
The Vaultz News
No Result
View All Result
in Extractives/Energy

ECG Upgrades Major Power Infrastructure in Adenta

Prince Agyapongby Prince Agyapong
February 25, 2026
Reading Time: 5 mins read
Power Infrastructure in Adenta

Power Infrastructure in Adenta

The Electricity Company of Ghana (ECG) has commenced a major ECG infrastructure upgrade in Adenta aimed at improving power supply quality and reliability for residents and businesses in the Greater Accra Region.

The project, which is already underway, seeks to address persistent erratic supply in the enclave caused by rising electricity demand that has stretched existing infrastructure beyond its capacity.

During a media inspection tour of the project site, Acting General Manager of Accra Subtransmission, Ing. Emmanuel Addo, explained that the initiative is designed to significantly enhance stability across Adenta and adjoining communities once completed.

At the heart of the upgrade is the expansion of the Adenta Primary Substation’s capacity from 40 megavolt-amperes (MVA) to 80MVA. According to ECG engineers, this doubling of capacity is critical to resolving load-related outages that have become increasingly frequent in recent months.

ADVERTISEMENT

“Three 20/26 transformers currently support the Adenta enclave, and the project intends to replace two of these 20/26MVA transformers with new 30/39MVA transformers.

“This upgrade aims to enhance the capacity of the transformers to accommodate the increasing demand.”

Ing. Emmanuel Addo, Acting General Manager of Accra Subtransmission

The installation of two brand-new 30/39MVA power transformers is expected to relieve pressure on the existing equipment and improve overall system resilience.

Addressing Rising Electricity Demand

Power Infrastructure in Adenta 2

Regional General Manager for Accra East, Ing. Bismark Otoo, said the decision to undertake the project was informed by sustained increases in load demand in and around Adenta.

He explained that rapid residential and commercial development in the area has placed considerable strain on the existing network infrastructure.

Customers in Adenta and neighbouring communities, he noted, have experienced frequent outages because the demand for electricity has outstripped transformer capacity.

According to him, the upgrade has become necessary not only to resolve current supply challenges but also to prepare the network for future growth.

The improved infrastructure is expected to benefit customers in Adenta, Amrahia, Oyarifa, Danfa, parts of Madina, Teiman and surrounding communities.

Ing. Addo disclosed that work on the project began on Sunday, February 22, 2026, and is being executed in two phases.

“The first phase will be completed on Friday, February 27, 2026. The timeline for the second phase will be determined after the successful commissioning of the first phase.”

Ing. Emmanuel Addo, Acting General Manager of Accra Subtransmission

The phased approach is intended to minimise prolonged disruptions while engineers carry out complex technical installations at the substation.

Broader Reliability Drive

Power Infrastructure in Adenta 3

Ing. Otoo indicated that the Adenta project forms part of a broader regional strategy to strengthen supply reliability across the Accra East Region.

ADVERTISEMENT

He revealed that similar infrastructure enhancement projects are ongoing in other parts of the region, reflecting ECG’s commitment to improving service delivery and customer satisfaction.

The company has in recent years faced public scrutiny over intermittent outages and service reliability, making infrastructure investment a key priority in its operational strategy.

By upgrading critical substations and replacing aging equipment, ECG aims to reduce technical losses, prevent transformer overloads and ensure more stable voltage levels for consumers.

As the upgrade progresses, ECG has cautioned the public against engaging private electricians during power outages.

Ing. Otoo warned that unauthorised interventions often lead to transformer overloading, illegal connections, substandard fuse installations and improper phase transfers, which can damage equipment and prolong outages.

He emphasised that such practices not only compromise network safety but also undermine the integrity of the power system.

Customers experiencing outages have been advised to contact ECG’s Contact Centre on 0302 611 611, visit the nearest district office, use the ECG PowerApp, or reach the company through its official social media platforms for prompt assistance.

Commitment to Improved Service

Power Infrastructure in Adenta

ECG reiterated its commitment to delivering quality, reliable and stable electricity supply to customers across the Greater Accra Region.

The ongoing infrastructure investment in Adenta underscores the utility’s recognition of rising demand pressures and the need for proactive network expansion.

Once completed, the ECG infrastructure upgrade in Adenta is expected to significantly stabilise supply in the enclave and position the network to meet future growth without recurring disruptions.

For residents and businesses who have endured intermittent power challenges, the project represents a critical step toward a more dependable electricity system in one of Accra’s rapidly expanding communities.

READ ALSO: AGI and Trinidad & Tobago Move to Tangible Trade

Sign Up to Our Newsletter

Fresh updates, Straight to your inbox

Tags: Accra electricity upgradeAdenta power supplyECG Adenta projectECG infrastructure expansionECG transformersGreater Accra power stability
Share2Tweet1ShareSendSend
Please login to join discussion
Previous Post

AGI and Trinidad & Tobago Move to Tangible Trade

Next Post

Golden Star Resources Pledges Economic Policies Support & Partnerships

Related Posts

Mining Site
Extractives/Energy

Tarkwa Mine: Host Communities Push Back Against Calls for Rejection Of Lease Renewal

May 31, 2026
TOR delegation at AFIIA
Extractives/Energy

TOR Champions Financial Compliance Through 2026 AFIIA Conference

May 30, 2026
GoldBod CEO receiving award
Extractives/Energy

GoldBod CEO Grabs CEO of the Year Award at 2026 CEO Summit

May 29, 2026
Mr. Sammy Gyamfi, Gold Board CEO
Extractives/Energy

Ghana To Host 600 Tonne Capacity Gold Refinery By 2027 – Sammy Gyamfi Hints

May 29, 2026

Sign Up to Our Newsletter

Fresh updates, Straight to your inbox

Recent News

Charles Osei Owusu, Senior Manager Fintech Business, MMFL Commercial Operations, addressing the Ghana National Tailors and Designers Association

MMFL Launches Wo Nkɔsoɔ Initiative to Formalize Ghanaian MSMEs

May 31, 2026
Nations FC and Dreams FC clash in the GPL at the Dr. Kwame Kyei Sports Complex in Abrankese

Dreams FC, Nations FC Set for MTN FA Cup Final Showdown in Legon

May 31, 2026
Mining Site

Tarkwa Mine: Host Communities Push Back Against Calls for Rejection Of Lease Renewal

May 31, 2026
Former Health Secretary, Wes Streeting

Streeting Pushes Youth Employment Incentives and North Sea Expansion

May 31, 2026
Anthony Gordon fulfills childhood dream as he secures Barca move

Barcelona Transfer a Dream Come Through For Anthony Gordon

May 31, 2026
Next Post
Golden Star Resources Manager, George Nutor

Golden Star Resources Pledges Economic Policies Support & Partnerships

The Vaultz News

Copyright © 2025 The Vaultz News. All rights reserved.

Navigate Site

  • About
  • Advertise
  • Privacy Policy
  • Contact

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Top Stories
  • News
    • General News
    • Education
    • Health
    • Opinions
  • Economics
    • Economy
    • Finance
      • Banking
      • Insurance
      • Pension
    • Securities/Markets
  • Business
    • Agribusiness
    • Vaultz Business
    • Extractives/Energy
    • Real Estate
  • World
    • Africa
    • America
    • Europe
    • UK
    • USA
    • Asia
    • Around the Globe
  • Innovation
    • Technology
    • Wheels
  • Entertainment
  • 20MOBPL2D
  • Jobs & Scholarships
    • Job Vacancies
    • Scholarships

Copyright © 2025 The Vaultz News. All rights reserved.

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.

Discover the Details behind the story

Get an in-depth analysis of the news from our top editors

Enter your email address